The short answer: almost always, yes

Thinking about adding a mezzanine floor to your warehouse, unit or shop? One of the first questions is whether you need building regulations approval. In England, the answer is almost always yes. A mezzanine is a new floor inside a building, and that counts as building work, which needs sign-off from a building control body before you start.
 
Approval is nothing to be nervous about, but it is something to plan for. Get it right and the project runs smoothly. Skip it and you could end up with a floor you cannot sell, insure or lease with confidence.
 
A quick note before we go on. This guide covers England. Wales, Scotland and Northern Ireland have their own versions of the rules, and Scotland uses building warrants instead, so check locally if your building is outside England.

Building regulations and planning permission are two different things

People often mix these up, so it helps to separate them. Building regulations are about how the floor is built: whether it is strong enough, safe in a fire and safe to use. Planning permission is about whether the work is allowed in terms of how the land and building are used and how they look.
 
Putting a mezzanine inside an existing building does not usually need planning permission, because interior alterations are generally not treated as development. The exceptions are set out in GOV.UK’s guidance on when permission is required, and the ones that matter most for mezzanines are these:
  • The mezzanine increases the floor space of retail premises by more than 200 square metres.
  • The work changes the outside of the building, for example with new windows or loading doors.
  • The mezzanine goes hand in hand with a change of use, such as turning storage space into retail.
  • The building is listed, in which case you will also need listed building consent.
If you rent your premises, check your lease too. You will usually need your landlord’s written consent before any work starts.

Which parts of the regulations apply?

The building regulations are split into sections called Approved Documents. You do not need to read them all. For a mezzanine, four matter most.
  • Part A, structure. The floor must carry the loads it is designed for, whether that is people, racking or stock, and the building underneath must be able to support it. Your designer supplies the drawings and calculations.
  • Part B, fire safety. This covers escape routes, how people get out from the new level and, in some cases, fire protection for the structure. Where a mezzanine is used as offices, the floor may need to resist fire for a set period, often up to 60 minutes depending on size and use.
  • Part K, protection from falling. This covers handrails, edge protection, staircases and loading gates, so nobody can fall from the edge or trip on the stairs.
  • Part M, access. This covers how people reach and use the new level, including whether step-free access is needed. That depends on the building and how the level will be used.
Other sections can come into play if you add extras such as heated offices, and Part L on energy is the most likely. If you want to see how we handle these at the design stage, our building regulations page explains the process.

Who you apply to and what they need to see

You apply to a building control body. That is either your local council’s building control team or a private registered building control approver, which is the current name for what used to be called an approved inspector.
 
For commercial premises, you will normally need a full plans application. That means drawings and calculations are checked and approved before work begins, rather than being inspected as you build. The fire and rescue service is usually consulted on the plans as well, so the process takes a little time, and it is worth building into your project timetable from day one.

Does a used mezzanine need approval too?

Yes. A second-hand floor has to meet exactly the same requirements as a new one. What matters is the design and the installation, not whether the steel is brand new. A recycled floor can comply, provided the materials are checked, the design suits your building and the work is signed off in the normal way.
 
That is good news if budget is a concern, because a used mezzanine floor can cut the cost of the project without cutting any corners on safety or compliance.

What happens after approval

Once you are approved, the building control body inspects the work at key stages as it goes up. When the mezzanine is finished, you receive a completion certificate. Keep it somewhere safe. Buyers, landlords and insurers may well ask to see it later on.

What if a mezzanine is already in place without approval?

It happens more often than you might think, especially when a business takes over premises that already have a mezzanine. If you are not sure the floor was ever approved, ask the local council’s building control team. In many cases they can deal with it through a process called regularisation, where they assess the existing work against the regulations. They may need to inspect or test parts of the structure, and they may ask for changes.

What happens if you skip approval?

According to GOV.UK, anyone carrying out work that does not comply can be prosecuted and fined, and the building control body can make you pay to put faulty work right. Without approval you also will not have the certificates you may need when you come to sell. A mezzanine is a big investment. Protecting it takes a fraction of the effort.

Getting started

The simplest way to avoid problems is to involve a specialist at the design stage. We design every mezzanine to meet the building regulations, prepare the drawings and calculations building control asks for, and help you through the application. If you would like to talk through your building and what you need, ask for a free quote and we will take it from there. A rough idea of the size, what you plan to store or who will use the new level, and any drawings of the building you already have is enough for us to start.